Landowner contacts LWSRB for information and/or permit application to begin process.
-
LWSRB Executive Director conducts a field inspection to determine visibility of site when viewed from the river.
-
Riverway office prepares a general permit or schedules a visit to determine necessary conditions such as erosion control or screening vegetation.
-
LWSRB evaluates the permit at their monthly meeting and approves permit with necessary restrictions or requirements, or acts to address state Riverway concerns.
-
Construction or placement of a structure begins when landowner receives the permit and complies with applicable permit conditions.
-
Compliance inspection by DNR or LWSRB during construction or at permit expiration date.